7-35

C99 (PV1 zener barrier adjustment)

C100 (PV2 zener barrier adjustment)

The adjustment described below must be performed when a zener barrier is
used.
(1) Turn off the

DCP552

. When installation and wiring is completed, short-

circuit A and B on the resistance temperature detector.

(2) Turn on the

DCP552

and set setup data

C98

to 241.

(3) Display setup data

C99

and

C100

.

(4) Press the

ENTER key

to display the difference in resistance (A-B) between

zener barriers connected to wire A and wire B.

(5) Press the

ENTER key

to store the difference in resistance values (A-B) in

the

DCP552

.

(6) Press the

DISP key

to return to the normal display mode.

(7) urn off the

DCP552

and disconnect the wire between A and B.

Handing Precautions

• Adjust the resistance in the zener barriers connected to wire A and B to

20Ω or less. Adjustment is not possible if the resistance is higher than
20Ω.

• This adjustment is not required for inputs other than resistance

temperature detectors or when zener barriers are not to be used.

• When a zener barrier has been adjusted, compensation is performed for

this zener barrier. When resistance temperature detector inputs not
employing zener barriers are to be used, perform the above adjustment
without the zener barriers.

54 55 56

RTD

57 58 59

A

B

C

RTD

Short-

circuit

Short-

circuit

A

B

C

¥ PV1 zener barrier adjustment

¥ PV2 zener barrier adjustment

Zener

barrier

Zener

barrier

Zener

barrier

Zener

barrier

Zener

barrier

Zener

barrier

Chapter 7. PARAMETER SETUP