beautypg.com

Plan the installation installation – Broan Ventilation Fan with Light and Heater 100HFL User Manual

Page 2

background image

Page 2

MODEL 100HFL

PLAN THE INSTALLATION

INSTALLATION

2. Mount housing.

Extend hanger bars to the width of the framing. Hold fan

in place with the hanger bar tabs wrapping around the

bottom edge of the framing.

Nail fan to framing or fasten with screws (not provided)

through holes near nails.

* To ensure a noise-free mount: Secure hanger bars

together with screws or use a pliers to crimp mounting

channels tightly around hanger bars.

1. Insert hanger bars.

Four (4) sliding hanger bars are provided to allow for

accurate positioning of housing anywhere between

framing. They can be used on all types of framing (I-joist,

standard joist, and truss construction) and span up to 24”.

Slide hanger bars into channels on housing. Make sure

hanger bar tabs face “up” as shown.

3. Attach

damper

/ duct

connector to

housing.

Snap damper /

duct connector

onto housing.

Make sure

connector is flush

with top of housing

and damper flap

falls closed.

4. Install 4-

inch round

ductwork.

Connect 4-inch

round ductwork

to damper / duct

connector. Run

ductwork to a roof

cap or wall cap.

Tape all ductwork

connections to

make them secure

and air tight.

TAB

CHANNEL

HANGER

BARS

HANGER

BARS

CHANNEL

BoTToM EDGE

oF FRAMING

* SCREW (2)

HoLE FoR oPTIoNAL

SCREW MoUNTING (4)

NAIL (4)

The unit will operate most quietly and efficiently when located

where the shortest possible duct run and minimum number of

elbows will be needed.
Use a roof cap or wall cap that has a built-in damper to reduce

backdrafts.
Plan to supply the unit with proper line voltage and appropriate

power cable.

RooF

CAP

*

4-IN. RoUND

ELBoW(S)

*

4-IN.

RoUND

DUCT

*

WALL

CAP

*

*

Purchase

separately

INSULATIoN

(Can be placed

around and over

housing.)

HoUSING