WarmlyYours SCV-DUAL User Manual
Page 8

Snow Switch
®
Model LCD–8 Aerial Snow Controller, 100 – 240 VAC
24782 Rev. A 03/13
(800) 234-4239
http://www.networketi.com
7 of 14
Environmental Technology, Inc.
Install in accordance with the requirements of all appli-
cable electrical and building codes and regulations. Ensure
that all conduit and cable terminations are watertight.
NEC Article 426.28 requires Equipment Ground Fault
Protection (GFEP) for Ice and Snow Melting Equipment.
This functionality is not provided as part of this controller
and shall be provided as part of the overall system.
Wiring: Direct Heater
BLK
L1
YEL
YEL
WHT
L2/N
100–240 VAC
50/60 Hz
Resistive load, up to 16 amps
(Self-limiting Cable, Constant-
Wattage Cable, MI Cable, etc.)
Wiring: External Contactor
BLK
L1
YEL
WHT
L2/N
100–240 VAC
50/60 Hz
K1
Inducitve load, up to 3 amps
(Contactor, Pump Motor,
Motorized Valve, etc.)
YEL
Wiring: Dry Contact
BLK
L1
WHT
YEL
YEL
L2/N
100–240 VAC
50/60 Hz
Dry Contacts