4 example scenario 2 - two point lifting – Lukas Rerailing system User Manual
Page 16

16
4.4 Example scenario 2 - Two point lifting
Two point lifting is carried out by the assisting train manager if he considers the situation
of the rail-bound vehicle to be unstable, or if the rerailing concept provides for this. The as-
sisting train manager assesses the damage situation and has the equipment and devices
positioned according to their intended purpose.
Item No.
Product
Number
70-10-30
PC 650-2POWER electric motor 230V / 50 Hz
1
8411720043
10 litres hydraulic oil VG-10
2
70-63-01
Pair of hoses 10 m control table-traversing cylinder
1
70-63-01
Pair of hoses 10 m control table-locking pin
1
70-63-01
Pair of hoses 10 m control table-lifting cylinder
2
70-20-10
Control table CU 2DV, including support frame
1
840724665N
Cylinder HP10/T280R
2
840723765N
Cylinder HP25/T 450R
2
84072466548
Piston plate for round piece r 40 mm
2
841281319
Foot-plate Alu HP 10 / HP 25
4
840728863
Step set for HP 10/T...HP or 25/T...
2
70-30-10
traversing unit TC170/90-350, anchor hydraulic
1
840720640
Rolling carriage RC700/350
2
LKHR840720571
Connecting rods1030-1800
1
LKHR840720575
Connecting rods1500-2800
1
840725750
Rerailing bridge 2.2m x 140mm x 350 mm
2
840726555
Connecting element 140mm
1