2 example scenario 1 - single point lifting – Lukas Rerailing system User Manual
Page 10

10
Single point lifting is carried out by the assisting train manager if rail-bound vehicles have
only been derailed slightly at the front and a suitable lifting point is available. The rear axle,
or the bogie, should still be on the rails to provide stability.
The assisting train manager assesses the damage situation and uses the equipment in
accordance with their intended use, or has them distributed.
4.2 Example scenario 1 - Single point lifting
Item No.
Product
Number
70-10-30
PC 650-2POWER electric motor 230V / 50 Hz
1
8411720043
10 litres hydraulic oil VG-10
2
70-63-01
Pair of hoses 10m control table-traversing cylinder
1
70-63-01
Pair of hoses 10m control table-locking pin
1
70-63-01
Pair of hoses 10 m control table-lifting cylinder
1
70-20-10
Control table CU 2DV, including support frame
1
840723765N
Cylinder HP25/T 450R
1
841281319
Foot-plate Alu HP 10 / HP 25
1
840728863
Step set for HP 10/T...HP or 25/T...
1
70-30-10
Movement unit TC170/90-350, anchor hydraulic
1
840720640
Rolling carriage RC700/350
1
840726350
Rerailing bridge 1.1m x 140mm x 350mm
1
840725750
Rerailing bridge 2.2m x 140mm x 350mm
1
840726555
Connecting element 140mm
1