S-cape ii mr programming 2 hand controls - 2 beds, Pos 1 – InnoMax Scape Hand Control User Manual
Page 9
9
S-
Cape II MR Hand Control Operation Guide
HAND CONTROL
BED 1
HAND CONTROL
BED 2
The six step procedure below is required to program 2 hand controls to operate 2 beds.
Before beginning, make certain the beds are plugged into a working grounded electrical
outlet.
STEP 1
On bed 1, press the learn button for 1
second and release. The bed will be
equipped with either a power down box or
J box (FIGURE 1).
STEP 2
On hand control 1, simultaneously press and
hold the
Pos 1
and the head massage on/off
buttons. The transmission indicator light will
flash slowly and then flash rapidly. Continue
to hold for 2 seconds and then release the
buttons (FIGURE 2).
STEP 3
Repeat Step 1 and Step 2 with hand control 2.
STEP 4
On bed 2, press the learn button for 1
second and release. The bed will be
equipped with either a power down box or
J box (FIGURE 1).
STEP 5
On hand control 1, simultaneously press and
hold the
Pos 1
and the head massage on/off
buttons. The transmission indicator light will
flash slowly and then flash rapidly. Continue
to hold for 2 seconds and then release the
buttons (FIGURE 2).
STEP 6
Repeat Step 4 and Step 5 with hand
control 2.
Two hand controls are now programmed
to operate two beds.
FIGURE 1: Power down box and J box receiver units.
J BOX
POWER
DOWN BOX
LEARN
BUTTON
LEARN
BUTTON
NOTE: POWER
DOWN BOX IS
NOT MOUNTED
TO BED FRAME.
J BOX IS
MOUNTED TO
THE BOTTOM
SIDE OF THE
BED FRAME.
TRANSMISSION
INDICATOR LIGHT
FIGURE 2
HEAD MASSAGE
ON/OFF BUTTON
POS 1 BUTTON
S-CAPE II MR PROGRAMMING
2 hand controls - 2 beds