beautypg.com

InstallationⅠ(between joist mounting), Installation joist mounting-Ⅰ) continued Ⅰ(between – Panasonic FV-07VFH3 User Manual

Page 7

background image

INSTALLATIONⅠ(BETWEEN JOIST MOUNTING)

7

16 inches and
19.2 inches
horizontal joist
19.2 inches
vertical joist

A

B

19.2 inches vertical joists

19.2 inches horizontal joists

16 inches

Spacing A on center joists

Unit:inches (mm)

B

13 1/4 15 1/2(336 394)

~

~

14 3/4 16 3/4(374 425)

~

~

16 1/2 18 3/4(419 476)

~

~

3.Fix the hanger unit to the ceiling.
(1) Using 1 of the ST4.2X30 tapping screws
provided

accessory package to fix

the hanger unit to the ceiling.

in the

(Fig.3)

(2) Using 4 of the ST4.2X30 tapping screw

provided

accessory package to fix

the suspension brackets to the joist .

s

in the

s

(Fig.4)

Fig.3

Fig.4

Joist

Circular duct

Duct tape

① Take out the cord cover and stress relief
two knockout holes.(Fig.5)

Cord cover

Knock-out hole

INSTALLATION

JOIST MOUNTING-Ⅰ) CONTINUED

Ⅰ(BETWEEN

5. The connection of power wire and control
lead wire.

4. Slip the circular duct onto the adaptor and
secure it with duct tape.(Fig.4)

Control lead wires(4 wires)

Conduit

Power wires
(3 wires)

Fig.6

WARNING:
1.Wiring procedures and connections shall
be in accordance with the national and
local electrical codes having jurisdiction.
2.This product must be properly grounded.

Fig.5

② Secure conduits, pass house power wires
and control lead wires througth the holes.
(Fig.6)