beautypg.com

Installation instructions – GE ZV925SLSS User Manual

Page 19

background image

19

Installation Instructions

STEP 4 INSTALL UPPER SUPPORT FRAME

• Raise the upper support

toward the ceiling.

• Thread the house wiring

through one of the large
holes, preferably on the
left side.

• Carefully engage the

ceiling mounting screws
to the keyhole slots in
the top of the frame.

• Tighten the 4 mounting

screws against the frame.

• Install 2 safety screws.

• Slide air deflector into

the support frame.

• Secure the deflector

to the support with
4 screws.

• Install the duct

piece to the
bottom of the
deflector and seal
the connection
with duct tape.

Safety

screws

Keyhole

slots

House

wiring

Keyhole

slots

,167$//$7,21³5(&,5&8/$7,1*

STEP 3 INSTALL AIR DEFLECTOR,

CUT DUCT FOR RECIRCULATING

OPERATION

FRONT

• Temporarily, slide the

air deflector into the
support frame.

FRONT

• Measure duct length

between the deflector and
over the exhaust opening.

• Cut duct piece to length

and set aside.

Duct

length