Installation instructions – GE ZV925SLSS User Manual
Page 19
19
Installation Instructions
STEP 4 INSTALL UPPER SUPPORT FRAME
• Raise the upper support
toward the ceiling.
• Thread the house wiring
through one of the large
holes, preferably on the
left side.
• Carefully engage the
ceiling mounting screws
to the keyhole slots in
the top of the frame.
• Tighten the 4 mounting
screws against the frame.
• Install 2 safety screws.
• Slide air deflector into
the support frame.
• Secure the deflector
to the support with
4 screws.
• Install the duct
piece to the
bottom of the
deflector and seal
the connection
with duct tape.
Safety
screws
Keyhole
slots
House
wiring
Keyhole
slots
,167$//$7,21³5(&,5&8/$7,1*
STEP 3 INSTALL AIR DEFLECTOR,
CUT DUCT FOR RECIRCULATING
OPERATION
FRONT
• Temporarily, slide the
air deflector into the
support frame.
FRONT
• Measure duct length
between the deflector and
over the exhaust opening.
• Cut duct piece to length
and set aside.
Duct
length
- JV536HSS (40 pages)
- JV666HSS (36 pages)
- JV536HSS (2 pages)
- JN327HWW (16 pages)
- JV347HCC (2 pages)
- PV976NSS (52 pages)
- PV970NSS (2 pages)
- JV566HSS (2 pages)
- JV936DSS (2 pages)
- JV636HSS (2 pages)
- JVE40STSS (32 pages)
- JVE40DTBB (2 pages)
- JV535HWW (2 pages)
- JN327HWW (2 pages)
- PV976NSS (2 pages)
- JV348LSS (2 pages)
- JV665HBB (2 pages)
- JV394SBB (2 pages)
- JV930SCBR (8 pages)
- PV977NSS (2 pages)
- PV977NSS (60 pages)
- JV966DSS (2 pages)
- CV966TSS (2 pages)
- JV694SBB (2 pages)
- JV960SCBR (8 pages)
- JV367HWW (2 pages)
- JVE40STSS (2 pages)
- JV960SCBR (2 pages)
- CV936MSS (2 pages)
- JV930SCBR (2 pages)
- JV666HSS (2 pages)
- ZV48TSFSS (4 pages)
- ZV48RSFSS (12 pages)
- ZV48RSFSS (9 pages)
- ZV30SSFSS (16 pages)
- ZV48TSFSS (3 pages)
- ZV36SSFSS (4 pages)
- ZV36SSFSS (3 pages)
- ZVC42LSS (4 pages)
- ZVC42LSS (68 pages)
- ZVC42LSS (32 pages)
- ZVC48LSS (2 pages)
- ZV36RSFSS (3 pages)
- ZV36RSFSS (4 pages)
- ZV30HSRSS (2 pages)