Site-Planning Checklist
3
Power evaluation:
•
Input power type
•
Receptacle proximity to the equipment
•
Dedicated (separate) circuits for redundant
power supplies
•
UPS for power failures
4
Grounding evaluation:
•
Circuit breaker size
5
Cable and interface equipment evaluation:
•
Cable type
•
Connector type
•
Cable distance limitations
•
Interface equipment (transceivers)
6
EMI evaluation:
•
Distance limitations for signaling
•
Site wiring
•
RFI levels
Table 2-2
Site-Planning Checklist (continued)
Task No.
Planning Activity
Verified by
Time
Date