6 initial settings – Furuno SC-120 User Manual
Page 32
2. INSTALLATION
2-18
How to attach connector N-P-8DFB
Outer Sheath
50
30
1
5
10
Armor Inner Sheath Shield
Cover with heat-shrink tubing and heat.
Cut off insulator and core by 10 mm.
Twist shield end.
Slip on clamp nut,
gasket and clamp as shown left.
Clamp Nut Gasket
(reddish
brown)
Clamp
Aluminum Foil
Trim shield here.
Fold back shield over clamp and trim.
Cut aluminum foil at four places,
90 from one another.
Fold back aluminum foil onto shield
and trim.
Trim aluminum
tape foil here.
Insulator
Expose the insulator by 1 mm.
Expose the core by 5 mm.
Clamp Nut
Pin
Solder through
the hole.
Slip the pin onto the conductor.
Solder them together through the
hole on the pin.
Insert the pin into the shell.
Screw the clamp nut into the shell.
(Tighten by turning the clamp nut.
Do not tighten by turning the shell.)
Shell
(Dimensions in millimeters.)
How to attach connector N-P-8DFB
•
Connect the DGPS antenna cable to the BEACON ANT port on the processor
unit. The standard cable is 15 m long. With the optional extension cable the
cable can be extended to 30 m or 60 m.