beautypg.com

Step 2 framing the fireplace, Caution – Heat & Glo Fireplace PIER-TVFL st-42tvfl User Manual

Page 9

background image

15

MODEL

A

B

C

PIER

40

1/4

23

1/4

41

1/2

ST-42TVFL

44

23

1/4

41

1/2

Minimum Clearances from the B-Type Vent Pipe
to Combustible Materials is 1 inch (25 mm) all
around the pipe.

Step 2
Framing the
Fireplace

Fireplace framing can be built before or after the
fireplace is set in place. Framing should be
positioned to accommodate wall coverings and
fireplace facing material. The diagram below shows
framing reference dimensions.

CAUTION

MEASURE FIREPLACE DIMENSIONS, AND
VERIFY FRAMING METHODS AND WALL
COVERING DETAILS, BEFORE FRAMING
CONSTRUCTION BEGINS.

Figure 5. Framing Dimensions

A

C

B

ST-42TVFL

FRAMING
HEADERS

C

A

B

PIER-TVFL