Installation preparation – haier HHX7130 User Manual
Page 6
English
Installation Preparation
To install this range hood, you will need the following tools and materials:
Note: This procedure will require 2 people for easier installation.
Tools Needed for Installation
• Drill
• 1/8" Drill bit for drilling pilot holes
• 1-1/4" Wood bit for drilling electrical wiring access hole
• 3/8" Nut Driver or Ratchet with Extension
• Phillips head screwdriver
• Flat-head screwdriver
• Pliers
• Pencil, ruler and level for marking range hood location
• Hand saw or jig saw for cutting the wall or cabinet openings
• Duct tape
• Electrical tape
• Connector Clamp
General Preparation
Caution!
Please be sure to turn the electrical power switch OFF before beginning
the installation.
1. Remove the range hood from the carton.
2. Lay the range hood upside down on a table covered with either cardboard or paper
to prevent scratching the hood or table.
3. Remove the 2 grease filters from the hood. Place them somewhere safe so they will
not be damaged.
4. Install two 40 Watt light bulbs.
5. Turn the hood right side up so you can see the duct knockouts and mounting holes.
5