Final checks – Hubbell Electric Heater Company V15 User Manual
Page 12

12
FINAL CHECKS
1. Check all connections for tightness.
2. Ensure that all the above steps are completed
3. After the water is heated for the first time, monitor the water temperature as described in
Section III, Quarterly Inspection.
Outgoing Hot
Water
Incoming Cold Water
1 – V Model Water Heater
2 – Pressure and Temperature Relief Valve (pipe overflow to floor drain or sink)
3 – Drain Valve
4 – Pressure/Temperature Gauge
5 – Shut-Off Valve
6 – Union
This manual is related to the following products: