beautypg.com

5gb installation, Wall drilling and bracket fixing, Mounting the hood body – Hotpoint HD90X User Manual

Page 5

background image

5

GB

INSTALLATION

Wall drilling and bracket fixing

Wall marking:
• Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre

of the area in which the hood will be installed.

• Draw a horizontal line at 650 mm above the hob.
• Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit aligning the

centre (notch) with the vertical reference line.

• Mark the wall at the centres of the holes in the bracket.
• Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the upper

chimney section supplied), aligning the centre (notch) with the vertical line (see diagram above).

• Mark the wall at the centres of the holes in the bracket.
• Mark a reference point as indicated at 116 mm from the vertical reference line and 323 mm above

the horizontal reference line.

• Repeat this operation on the other side.
• Drill ø 8 mm holes at all the centre points marked.
• Insert the wall plugs 11 in the holes.
• Fix the brackets using the 12a screws (4,2 x 44,4) supplied.
• Insert the two screws 12a (4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap of 5-

6 mm between the wall and the head of the screw.

Mounting the hood body

• Before attaching the hood body, tighten the two

screws Vr located on the hood body mounting
points.

• Hook the hood body onto the screws 12a
• Fully tighten support screws 12a
• Adjust screws Vr to level the hood body.

11

12a

323

X

116

1÷2

116

650 min.

7.2.1

12a

Vr