Т³гж 10, Installation, Introduction of indication board – haier BRF1- 120 User Manual
Page 10: Operation diagram, Introduction of indication board operation diagram
7
Installation
Pressure relief vent
Fig.4 S
ketch map of
Safety Valve
Note: If your water heater is not installed in
a bathroom with sewage drain, it is
suggested you connect a drain hose
(separately sold) to the safety valve.
Connect one end of the hose to the safety
valve vent and the other end to the sewage
drain. The hose can be cut short or
extended as necessary. The hose shall be
installed as inclined downward.
Fix the showerhead holder at a suitable
p l a c e o n t h e w a l l , a n d p l a c e t h e
showerhead on the holder. After making
sure the tank is full of water, connections
show no water leakage and power supply
complies with requirement, connect the
power supply and make trial operation.
Introduction of indication board
Introduction of indication board
1.
2.
3.
4.S
5.I
Heating mode icon of solar energy.
Simultaneous heating mode icon
Turning on/ turning off key of power supply
hort-cut key of electrical heating starting
con for preset 1
6. icon for clock setting
7. icon for preset heating time set
8. icon for preset 2
9. icon for temperature setting of electrical heating
10. icon for temperature errors of water pump starting
11. icon for running conditions of water pump
12. icon for preset heating mode
Note: the mixing valve is separately sold,you can get it from the local haier
service,and contact the appointed professional serving personnel for
installing and service.
To fill water into the system
To open water-exiting valve of hot water and to fill water into the whole
System (water-storing tank. collector equipment and system pipeline)
Through cold water opening of tap water. To close water exiting valve of hot
water until the air is exhausted and water flows out continually. Meanwhile, to
observe whether the system leaks and to keep the cold water entrance open
in the process of use.
8
Introduction of indication board
13. icon for intellectual power heating
14. upwards adjusting key
15. downwards adjusting key
16. indication icon of collector equipment temperature
17. selecting key of working mode
18. setting key of parameter
19. temperature indication of collector equipment
20. clock indication
21.temperature indication for tank
22.indication icon of tank temperature
Fig.5 Front view of indication board
Operation diagram
Turning off
on/ off
Mode
Turning on
Solar ener gy
heating
Simultaneous
heating
Intellectual heating
Minute setting of the clock
Press the setting key
Heating temperature setting of time1
Temperature setting for electrical heating
Hour setting of time1
Minute setting of time1
Heating temperature setting of time2
Hour setting of time2
Minute setting of time2
Temperature difference value setting
Hour setting of the clock
Temperature setting for electrical heating
Press
or
(adjusting key)
Preetting 1
presetting 2
Press the setting key
Press
or
(adjusting key)
Press the setting key
Press
or
(adjusting key)
Press the setting key
Press
or (adjusting
key)
(Press heating key,not
of water pump running
Starting electrical heating)
Starting electrical heating)
Starting electrical heating)
Starting electrical heating)
(Press heating key,not
(Press heating key
(Press heating key
Introduction of indication board
Operation diagram
H
W P
CLK
TIM
INT
PRE
CT
TD
SOL
HEAT
MODE
SET
2221 20 19 18 1716
W
T
H
C