beautypg.com

Т³гж 10, Installation, Introduction of indication board – haier BRF1- 120 User Manual

Page 10: Operation diagram, Introduction of indication board operation diagram

background image

7

Installation

Pressure relief vent

Fig.4 S

ketch map of

Safety Valve

Note: If your water heater is not installed in
a bathroom with sewage drain, it is
suggested you connect a drain hose
(separately sold) to the safety valve.
Connect one end of the hose to the safety
valve vent and the other end to the sewage
drain. The hose can be cut short or
extended as necessary. The hose shall be
installed as inclined downward.
Fix the showerhead holder at a suitable
p l a c e o n t h e w a l l , a n d p l a c e t h e
showerhead on the holder. After making
sure the tank is full of water, connections
show no water leakage and power supply
complies with requirement, connect the
power supply and make trial operation.

Introduction of indication board

Introduction of indication board

1.
2.
3.
4.S
5.I

Heating mode icon of solar energy.
Simultaneous heating mode icon
Turning on/ turning off key of power supply

hort-cut key of electrical heating starting

con for preset 1

6. icon for clock setting
7. icon for preset heating time set
8. icon for preset 2
9. icon for temperature setting of electrical heating
10. icon for temperature errors of water pump starting
11. icon for running conditions of water pump
12. icon for preset heating mode

Note: the mixing valve is separately sold,you can get it from the local haier
service,and contact the appointed professional serving personnel for
installing and service.

To fill water into the system

To open water-exiting valve of hot water and to fill water into the whole
System (water-storing tank. collector equipment and system pipeline)
Through cold water opening of tap water. To close water exiting valve of hot
water until the air is exhausted and water flows out continually. Meanwhile, to
observe whether the system leaks and to keep the cold water entrance open
in the process of use.

8

Introduction of indication board

13. icon for intellectual power heating
14. upwards adjusting key
15. downwards adjusting key
16. indication icon of collector equipment temperature
17. selecting key of working mode
18. setting key of parameter
19. temperature indication of collector equipment
20. clock indication
21.temperature indication for tank
22.indication icon of tank temperature

Fig.5 Front view of indication board

Operation diagram

Turning off

on/ off

Mode

Turning on

Solar ener gy
heating

Simultaneous
heating

Intellectual heating

Minute setting of the clock

Press the setting key

Heating temperature setting of time1

Temperature setting for electrical heating

Hour setting of time1

Minute setting of time1

Heating temperature setting of time2

Hour setting of time2

Minute setting of time2

Temperature difference value setting

Hour setting of the clock

Temperature setting for electrical heating

Press

or

(adjusting key)

Preetting 1
presetting 2

Press the setting key

Press

or

(adjusting key)

Press the setting key

Press

or

(adjusting key)

Press the setting key

Press

or (adjusting

key)

(Press heating key,not

of water pump running

Starting electrical heating)

Starting electrical heating)

Starting electrical heating)

Starting electrical heating)

(Press heating key,not

(Press heating key

(Press heating key

Introduction of indication board

Operation diagram

H

W P

CLK

TIM

INT

PRE

CT

TD

SOL

HEAT

MODE

SET

2221 20 19 18 1716

W

T

H
C

This manual is related to the following products: