beautypg.com

R410a, Caution, 11+2= kg – haier 0010506358 User Manual

Page 4: 2kg 2= 1

background image

Open

No gas leakage?

5.

Detach the charge hose

6.

from the service port, open 2-way valve and 3-way. Turn

the valve rod anticlockwiseuntil hitting lightly.

In case of gas leakage, tighten parts of pipe connection. If

leakage stops, then proceed 6. steps

If it does not stop gas leakage, discharge whole refrigerants from the service

port. After flaring work again and vacuumize, fill up prescribed

refrigerant from the gas cylinder.

Anti countercurrent joint

Gaugemanifold(for R410A)

2-way valve Liquid Side

3-way valve Gas Side

Vacuum pump(for R410A)

Tube(for R410A)

Close

2-way valve

3-way valve

Open 90

O

2-way valve

3-way valve

2-way valve 3-way valve

2-way valve

3-way valve

Valve rod cap

Valve rod cap

Service port cap

To prevent the gas leakage, turn the service port’s cap, the valve rod’s cap for 2-way

valve and 3-way’s a little more than the point where the torque increases suddenly.

After attaching the each caps, check the gas leakage around the caps.

7.

8.

Step 1.

Step 2.

Step 3.

Step 7.

Step 6.

Step 4.

The power source must be exclusively used for air

conditioner. (Over I0A)

In the case of installing an air conditioner in a moist place,

please install an ea-

For installation in other places, use a circuit breaker as far

as possible.

Pipe cutting is carried out with a pipe cutter and burs must

be removed.

After inserting the flare nut, flaring work is carried out.

If the refrigerant of the air conditioner leaks, it is necessary to discharge all the

refrigerant. Vacuumize first, then charge the liquid refrigerant into air conditio-

ner according to the amount marked on the name plate.

Please do not let other cooling medium, except specified one (R410A), or air

enter into the cooling circulation system. Otherwise, there will be abnormal

high pressure in the system to make it crack and lead to personal injuries.

1

Power Source Installation

2

Cutting and Flaring Work of Piping

Flare tooling die

1.Cut pipe

2.Remove burs

3.Insert the flare nut

CAUTION

Flare tool for R410A

Conventional flare tool

Clutch-type

clutch-type(Rigid-type) Wing-nut type (Imperial-type)

A

0~0.5mm

1.0~1.5mm

1.5~2.0mm

rth leakage breaker.

4.Flare pipe

Lean Damage of flare Crack

Partial Too outside

Correct

Incorrect

3

On Drainage

It becomes

high midway.

The gap with the

ground is too smal

There is the bad

smell from a ditch

It waves.

The end is imm-

ersed in water.

Please install the drain hose so as to be downward slope without fail.
Please don’t do the drainage as shown below.


Please pour water in the drain pan of the indoor unit, and

is carried out surely to outdoor.

In case that the attached drain hose is in a room, please

apply heat insulation to

Less than

5cm

confirm that drainage

it without fail.

4

1

1+2=

kg

R410A

2

kg

2=

1=

B

C

D

F

E

kg

A

This product contains fluorinated greenhouse gases covered by

the Kyoto Protocol. Do not vent into the atmosphere.

Refrigerant type:R410A

GWP* value:1975

GWP=global warming potential

Please fill in with indelible ink,

• 1 the factory refrigerant charge of the product

• 2 the additional refrigerant amount charged in the field and

• 1+2 the total refrigerant charge

on the refrigerant charge label supplied with the product.

The filled out label must be adhered in the proximity of the product

charging port (e.g. onto the inside of the stop value cover).

A contains fluorinated greenhouse gases covered by the Kyoto

Protocol

B factory refrigerant charge of the product: see unit name plate

C additional refrigerant amount charged in the field

D total refrigerant charge

E outdoor unit

F refrigerant cylinder and manifold for charging

Contains fluorinated greenhouse gases

covered by the Kyoto Protocol

Refrigerant charge label

Check Items for Test Run

Put check mark

in boxes

Gas leak from pipe connecting?

Heat insulation of pipe connecting?

Are the connecting wirings of indoor and outdoor firmly

Is the connecting wiring of indoor and outdoor firmly fixed?

Is drainage securely carried out?

Is the earth line securely connected?

Is the indoor unit securely fixed?

Is power source voltage abided by the code?

Is there any noise?

Is the lamp normally lighting?

Are cooling and heating (when in heat pump) performed normally?

Is the operation of room temperature regulator normal?

Please kindly explain to our customers how to operate

through the instruction manual.

Check for Installation and Test Run

inserted to the terminal block?

After 6 seconds, close the 2-way valve and make the inspection of gas leakage.