
27
OPERATION
PARALLEL OPERATION CABLE
(optional equipment)
If two generators were connected for parallel operation, disconnect
the parallel operation cable after stopping the engines if you do not
wish to resume parallel operation.
4.
09/02/17 17:15:49 31Z07700_028