beautypg.com

Mounting the f90 using threaded steel rod, F90b, F90a – Honeywell F90B User Manual

Page 9: Fig. 7. f90 installation dimensions in in. (mm)

background image

F90A,B SELF-CONTAINED COMMERCIAL ELECTRONIC AIR CLEANER

68-0103-6 Revised 11-07

9

Fig. 7. F90 installation dimensions in in. (mm).

M920

29-1/4
(743)

8

(203)

24

(610)

LATCHES

POWER

CORD

1

ALLOW AT LEAST 9 INCHES (229 MILLIMETERS) FROM
BACK OF F90 TO WALL FOR REMOVAL OF COVER.

7 (178)

1

2

2

ALLOW AT LEAST 16 INCHES (406 MILLIMETERS) FROM
FRONT OF F90 TO WALL FOR INSTALLATION AND
REMOVAL OF CELLS.

3 (76)

16

(406)

F90B

3/8 (10) DIAMETER

3/8 (10) DIAMETER

KEYHOLE

24 (610)

29-1/4 (743)

16 (406)

2 (51)

7/8 (22) DIAMETER
KNOCKOUT

4

(102)

1

2

9 (229)

F90A

29-1/4
(743)

24
(610) 16

(406)

19-1/4 (489)

14-1/2 (368)

3-1/4
(83)

5-3/4 (146)

3/4 (19)

M1533

DRILL 5/16 INCH
(8 mm)
PILOT
HOLES

5/8 INCH (19 mm)
DIAMETER KEY HOLES
PROVIDED IN AIR
CLEANER HOUSING

3/8 x 3 INCH
(10 x 76 mm)
LAG SCREW AND
WASHER

VENTURI
PLATE

REMOVE
CELLS
AND
FILTERS

TYPICAL 2 x 8 INCH
WOOD JOISTS,
16 INCH CENTERS

5-1/2 (140 mm)

Fig. 8. Mounting the F90 using lag screws in joist

applications.

Mounting the F90 Using Threaded
Steel Rod

1. Arrange two 2 x 4 supports as shown in Fig. 9.
2. Drill four 5/16 inch pilot holes through the supports

using the mounting template to locate holes.

3. Mount the steel rods to the supports.
4. Lift the F90 to the mounting location.
5. Mount the F90 to the steel rods by attaching the nuts

and washers.

This manual is related to the following products: