Pipe connection – Harbor Freight Tools Clear Water Pump 69297 User Manual
Page 4

Page 4
For technical questions, please call 1-800-444-3353.
SKU 69297
Specifications
Power Requirements
120V~ 60Hz 5A
Discharge/Intake
1 IN. NPT
Maximum Flow
650 GPH
Maximum Delivery Height
98 FT.
Suction Lift
20 FT.
Pressure
43 PSI
Cord Length
6 FT.
Set up
to pRevent electRic Shock and death FRom incoRRect uSaGe FolloW
theSe inStRuctionS:
this is not a submersible pump.
do not immerse in water.
pipe connection
The Pump uses 1" NPT piping (sold separately).
Purchase the necessary length of pipe, including any
needed fittings and bends. Mount the Pump as close to
the source of water as possible and within the range of
the rated Suction Lift. The connections must be airtight.
Wrap all threaded connections with PTFE tape (sold
separately).
Outlet
Priming Plug
Inlet
Pump
Housing
Figure 1
1. Remove the Inlet and Outlet Covers from the Pump.
2. Attach the water source to the Inlet, using appropriate
methods. The Inlet hose or pipe must be collapse-
proof to properly withstand the suction force.
3. Install a foot valve (sold separately)
at the bottom of the inlet.
4. Attach the outlet connection to the Outlet. A
Y-fitting with dual valves (sold separately) is
helpful for priming the pump (see next section).