beautypg.com

Henkel SubFloor User Manual

Technical guide

background image

169

168

PREPARING THE SUBFLOOR

The flooring contractor has responsibility for laying the
floorcovering only when he is satisfied that the subfloor
is in a suitable condition to receive the flooring.

Local regulations regarding subfloors and the
installation of floorcoverings must be complied with.

GENERAL INFORMATION

(NEW SUBFLOORS OR RENOVATION)

The subfloor must be absolutely hard, level, dry, smooth
and structurally sound.

The subfloor must be free of

cracks and other

irregularities and must not be contaminated with paint,
plaster, oil, grease or any other substance which could
affect adhesion.

Cracks must be filled with an appropriate material.

The following information provides you with basic
installation procedures. For technical products or more
detailed instructions please refer to our technical guide.

171 Tiles

172 Sheet

173 Saga

174 Conductive, dissipative

and antistatic
floorcoverings

174 Conductive flooring with

conductive adhesive and
conductive primer

175 Laying procedure for

residential sheet products

Laying procedures

168 to 175

Cold and hot welding

176

Adhesives

177

Maintenance

178 to 181

Technical guide

Technical guide

Te

chnical

guide