Handle installation – HONDA EM3800SX User Manual
Page 59
57
Handle Installation
TORQUE:
RIGHT HANDLE
BRACKET
LEFT HANDLE BRACKET
8
16 mm FLANGE BOLT (4)
LEFT UPPER HANDLE ASSY
RIGHT UPPER HANDLE ASSY
Install the right and left handles on the generator upper frame using
the brackets and 4 flange bolts.
17
22 lbf·ft (24
29 N·m , 2.4
3.0 kgf·m)
03/11/17 18:47:48 31Z21600_058