beautypg.com

Installation procedure, Preparation for the installation – haier HBU-18HF03 User Manual

Page 20

background image

3. PREPARATION FOR THE INSTALLATION

(1) Position of ceiling opening between unit and suspending bolt.

3

18

(2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.)

(3) Install a suspending bolt.
(Use a M10 bolt)

To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new
ceiling, use built-in type bolt or parts prepared in the field.
Before going on installing adjust space between ceiling.

Note: All the above mentioned parts shall be prepared in field.

Ceiling

50~100

Roof

Anchor bolt
Long nut

Suspending bolt

Refer to paper pattern for dimension of ceiling hole.
Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before installation.
Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent vibration.
Contact your real estate dealer

Suspending bracket

Ceiling

20 Over

Ornament panel

(Distance between suspending bolts)

Installation Procedure

535mm

650mm(Ceiling opening)

700mm(Ornament panel)

570mm(Indoor unit)

650mm(Ceiling opening)

700mm(Ornament panel)

570mm(Indoor unit)

320mm

150mm

60mm

This manual is related to the following products: