beautypg.com

Installation procedure, Preparation for the installation – haier AB182ACBEA User Manual

Page 23

background image

3. PREPARATION FOR THE INSTALLATION

(1) Position of ceiling opening between unit and suspending bolt.

3

21

Distance between

suspending bolts 460mm

Overlap between ceiling and
ornament panel shall be 15mm

Suspending bolts

Ceiling

Ornament panel

Note:
Dimension of ceiling opening marked with * can be as
large as 910mm, but the matching part of ceiling with
ornament panel shall be over 20mm.

20 Over

(160)

Suspending bracket

Ceiling

(2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.)

(3) Install a suspending bolt.
(Use a M10 bolt)

To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new
ceiling, use built-in type bolt or parts prepared in the field.
Before going on installing adjust space between ceiling.

Note: All the above mentioned parts shall be prepared in field.

Ceiling

50~100

Roof

Anchor bolt
Long nut

Suspending bolt

Refer to paper pattern for dimension of ceiling hole.
Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before installation.
Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent vibration.
Contact your real estate dealer

(For series 24 28 )

(For series 36 42 52 )

(For series 14 18 )

A

950(Ornament panel)

890(Ceiling opening)

840(Indoor unit)

780

(Distance between suspending bolts)

(Distance between suspending bolts)

A

950(Ornament panel)

890(Ceiling opening)

840(Indoor unit)

Suspending bolts

Refrigerant pipe

A

1280(Ceiling opening)

(Distance between suspending bolts)

890

515

515

(Distance between suspending bolts)

860(Ceiling opening)

780

630(Ornament panel)

600(Ceiling opening)

570(Indoor unit)

630(Ornament panel)

600(Ceiling opening)

570(Indoor unit)

Installation Procedure

This manual is related to the following products: