beautypg.com

Operating controls and adjustments, Operational controls and adjustments, Assembling top cover and dust chute – Electrolux 22-785 User Manual

Page 10: Starting and stopping planer, Locking switch in the “off” position

background image

10

ASSEMBLING TOP COVER AND
DUST CHUTE

1.

Fasten the top cover and dust chute (A) Fig. 16, to

the top of the planer, as shown, using the three
M6x16mm screws (B) supplied. IMPORTANT: The dust
chute opening (C) must point to the rear as shown.

Fig. 16

Fig. 17

2.

Fasten the left corner of the cover to the top of the

planer using the remaining M6x16mm screw (D) Fig. 17,
and cord clamp (E). NOTE: The motor cord (F) must be
inserted and positioned into the cord clamp as shown.

D

E

F

B

B

C

A

OPERATING CONTROLS AND ADJUSTMENTS

Fig. 18

A

B

Fig. 19

C

STARTING AND STOPPING PLANER

1. The on/off switch is located on the front of the

planer. To turn the machine “ON”, push the START
button (A) Fig. 18.

2. To turn the machine “OFF”, push the STOP button

(B) Fig. 18.

MAKE SURE THAT THE SWITCH IS IN
THE “OFF” POSITION BEFORE

PLUGGING IN THE POWER CORD. IN THE EVENT OF A
POWER FAILURE, MOVE THE SWITCH TO THE “OFF”
POSITION. AN ACCIDENTAL START-UP CAN CAUSE
INJURY.

LOCKING SWITCH IN THE “OFF”
POSITION

IMPORTANT: When the machine is not in use, the
switch should be locked

in the “OFF” position to prevent

unauthorized use,

using a padlock (C) Fig. 19 with a 3/16"

diameter shackle.

OPERATIONAL CONTROLS AND ADJUSTMENTS