beautypg.com

World class 3000 – Emerson ROSEMOUNT 3000 User Manual

Page 60

background image

Instruction Manual

IB-106-300NH Rev. 4.3
May 2005

2-24 Installation

Rosemount Analytical Inc. A Division of Emerson Process Management

World Class 3000

NOTE

Upon completing installation, make sure that the probe is turned on and operating prior to
firing up the combustion process. Damage can result from having a cold probe exposed to
the process gases.

Power down all probes during outages. Sensor chamber is heated to 736°C. Further, if ducts
will be washed down during the outage, remove the probes to prevent water damage.