Assembly, Unpacking and cleaning, Assembly tools required – Epson 36-714 User Manual
Page 9: Assembly time estimate - 2 to 3 hours, Fig. 2 parts
9
UNPACKING AND CLEANING
Carefully unpack the machine and all loose items from
the shipping container(s). Remove the protective coating
from all unpainted surfaces. This coating may be removed
with a soft cloth moistened with kerosene (do not use
acetone, gasoline or lacquer thinner for this purpose). After
cleaning, cover the unpainted surfaces with a good quality
household floor paste wax.
The basic saw unit is shown as shipped here in Fig. 2.
ASSEMBLY
ASSEMBLY TOOLS REQUIRED
*
Phillips head screw driver (not supplied)
*
12mm, 13mm and 18mm open end wrenches (not supplied)
*
Other wrenches and a drill with a 1/4 inch bit may be required, depending on what fence or tables will be used
ASSEMBLY TIME ESTIMATE - 2 to 3 hours
Fig. 2
FOR YOUR OWN SAFETY, DO NOT CONNECT THE MACHINE TO THE POWER SOURCE UNTIL
T H E M A C H I N E I S C O M P L E T E LY A S S E M B L E D A N D Y O U R E A D A N D U N D E R S TA N D T H E E N T I R E
INSTRUCTION MANUAL.
THE SAW IS EXTREMELY HEAVY. HAVE TWO OR MORE PEOPLE HELP LIFT AND MOVE
MACHINE AROUND DURING ASSEMBLY.
1
2
9
12
11
13
19
20
Fig. 2
Fig. 2 Parts
1.
7
/
16
"-20 x 1
1
/
4
" Hex Head Screw (6)
2.
7
/
16
" Flat Washer (6)
3.
7
/
16
" Lock Washer (6)
4.
M8x30 Hex Head Screw (1)
5.
M8 Nut (1)
6. M8 lock washer (1)
7. M8 flat washer (1)
8. M8x25 Hex Head Screw (2)*
9. M8 Washer (2)*
10. M8 Lock Washer (2)*
11.
1
/
4
”-20x
3
/
8
” Round Head Tap Screw (8)
12. M4 x 10mm Round Head Screw (6)
13.
1
/
4
"-20 x
3
/
4
" Hex Head Screw (2)
14.
1
/
4
" Flat Washer (2)
15.
1
/
4
" Lock Washer (2)
16.
5
/
16
"-18 x
5
/
8
Carriage Head Screw (1)
17.
5
/
16
" hex nut (1)
18.
5
/
16
" flat washer (1)
19. Nylon Washer (2)
20. M5x20mm Screw (1)
21. Washer for Miter Gage (1)
* Parts 8, 9 and 10 are included to attach the
rear rail of the fence to the table of this saw.
5
4
3
8
14
15
16
18
17
21
6
7
10