beautypg.com

Installation instructions – Hestan 24 Inch Countertop Convection Microwave Oven Installation Manual User Manual

Page 8

background image

D. DISASSEMBLY: The FRONT FRAME (J) and

BACK FRAME (K) come pre-assembled with ball

studs engaged in the receivers.

To Separate the FRONT FRAME from the BACK
FRAME:

a) Place the assembly face down on a

protected surface.

b) At the location of the ball stud, insert

a flat head screwdriver between the
FRONT FRAME and the BACK FRAME
and gently pry up to disengage the ball
stud from the receiver.

c) Repeat for each corner. See Figure 11.

Figure 11

E. BACK FRAME INSTALLATION: Position back

frame equal space top to bottom, side to side.

Mark for 4 holes, center punch and pre-drill with

1/16" [1.45 mm] drill bit. Secure frame with 4

SCREWS (G). See Figure 12.

EQUAL GAP TOP, BOTTOM

EQUAL GAP

SIDE TO SIDE

MOUNTING HOLES

MOUNTING HOLES

MOUNTING HOLES

MOUNTING HOLES

Figure 12

F. FRONT FRAME INSTALLATION:

a) Place the FRONT FRAME (J) onto the BACK

FRAME (K) and align ball studs and receivers.

b) Secure the FRONT FRAME to the BACK

FRAME by firmly pushing the front frame
onto the back frame engaging the four (4)
snap attachments. See Figure 13.

SNAP

ATTACHMENT

Figure 13

INSTALLATION INSTRUCTIONS

(CONT.)

©2019 Hestan Commercial Corporation

6

EN