Locating Gas Supply

The gas line can enter the unit either through the floor or outside wall.

The gas line opening should be made at this time. Location of the opening

will be determined by the position of floor joists and the valve and union

used for servicing.

Note: Never use plastic pipe. Check to confirm whether your local codes

allow copper tubing or galvanized.
Note: Since some municipalities have additional local codes, it is always

best to consult your local authority and installation code.
The use of the following gas connectors is recommended:

— ANS Z21.24 Appliance Connectors of Corrugated Metal Tubing and

Fittings

— ANS Z21.45 Assembled Flexible Appliance Connectors of Other

Than All-Metal Construction

The above connectors may be used if acceptable by the authority having

jurisdiction. The state of Massachusetts requires that a flexible appliance

connector cannot exceed three feet in length.

GAS SUPPLY

TEE HANDLE

FLEX TUBING

NPT NIPPLE

FLARE FITTING

FLARE SHUT OFF VALVE

CLOSE NIPPLE

TEE HANDLE

NPT NIPPLE

NPT UNION

SHUT OFF VALVE

NPT GAS SUPPLY

Figure 1

Consult the current National Fuel Gas Code, ANSI Z223.1 CAN/CGA-

B149 (.1 or .2) installation code.
Installing a New Main Gas Cock

Each appliance should have its own manual gas cock.
A manual main gas cock should be located in the vicinity of the unit.

Where none exists, or where its size or location is not adequate, contact

your local authorized installer for installation or relocation.

Compounds used on threaded joints of gas piping shall be resistant to the

action of liquefied petroleum gases. The gas lines must be checked for

leaks by the installer. This should be done with a soap solution watching

for bubbles on all exposed connections, and if unexposed, a pressure test

should be made.
Never use an exposed flame to check for leaks. Appliance must be

disconnected from piping at inlet of control valve and pipe capped or

plugged for pressure test. Never pressure test with appliance connected;

control valve will sustain damage!
A gas valve and ground joint union should be installed in the gas line upstream

of the gas control to aid in servicing. It is required by the National Fuel Gas

Code that a drip line be installed near the gas inlet. This should consist of a

vertical length of pipe tee connected into the gas line that is capped on the

bottom in which condensation and foreign particles may collect.

Figure 2

Method of Installing a Tee Fitting Sediment Trap

Pressure Testing of the Gas Supply System

1. To check the inlet pressure to the gas valve, a 1/8" (3mm) N.P.T.

plugged tapping, accessible for test gauge connection, must be placed

immediately upstream of the gas supply connection to the appliance.

2. The appliance and its individual shutoff valve must be disconnected

from the gas supply piping system during any pressure testing of that

system at test pressures in excess of 1/2 psig (3.5 kPa).

3. The appliance must be isolated from the gas supply piping system by

closing its individual manual shutoff valve during any pressure testing

of the gas supply piping system at test pressures equal to or less than

1/2 psig (3.5 kPa).

Attention! If one of the above procedures results in pressures in excess

of 1/2 psig (14" w.c.) (3.5 kPa) on the appliance gas valve, it will result

in a hazardous condition.
Checking Manifold Pressure

Both Propane and Natural gas valves have a built-in pressure regulator

in the gas valve. Natural gas models will have a manifold pressure of

approximately 4.0" w.c. (.996kPa) at the valve outlet with the inlet pressure

to the valve from a minimum of 5.0" w.c. (1.245kPa) for the purpose of

input adjustment to a maximum of 10.5" w.c. (2.61kPa). Propane gas

models will have a manifold pressure approximately 10.0" w.c. (2.49kPa)

at the valve outlet with the inlet pressure to the valve from a minimum of

11.0" w.c. (2.739kPa) for the purpose of input adjustment to a maximum

of 13.0" w.c. (3.237kPa).
A 1/8" (3mm) N.P.T. plugged tapping, accessible for test gauge connection,

is located on the outlet side of the gas control.

Recommended Gas Pipe Diameter

Pipe Length

Schedule 40 Pipe

Inside Diameter

Tubing, Type L

Outside Diameter

Nat.

L.P.

Nat.

L.P.

0-10 feet

0-3 meters

1/2”

12.7mm

3/8”

9.5mm

1/2”

12.7mm

3/8”

9.5mm

10-40 feet

4-12 meters

1/2”

12.7mm

1/2”

12.7mm

5/8”

15.9mm

1/2”

12.7mm

40-100 feet

13-30 meters

1/2”

12.7mm

1/2”

12.7mm

3/4”

19mm

1/2”

12.7mm

100-150 feet

31-46 meters

3/4”

19mm

1/2”

12.7mm

7/8”

22.2mm

3/4”

19mm

GAS SUPPLY

This manual is related to the following products: