Figure 15: Inside Vertical Installation.
1. Choose a stove location that is ideal. See the
section “D
ECIDING
W
HERE
TO
L
OCATE
YOUR
P
ELLET
A
PPLIANCE
.”
2. Place a non-combustible hearth pad where
necessary.
3. Place the unit on the hearth pad (if installed
on a combustible surface) and space the
unit in a manner so when the pellet vent is
installed vertically, it will be 3” (7.5 cm) away
from a combustible wall.
4. Install the tee with clean out.
5.
I
nstall the pellet vent upward from there.
When you reach the ceiling, make sure
that the vent goes through the ceiling fire
stop. Maintain a 3” (7.5 cm) distance to
combustibles and keep attic insulation away
from the vent pipe. Maintain an effective
vapor barrier.
6. Finally, extend the pellet vent to go through
the roof flashing.
7. Ensure that the rain cap is approximately 24”
(600 mm) above the roof.
To accomplish a outside vertical pipe installation,
follow steps 1 through 5 in the “I
NSIDE
V
ERTICAL
I
NSTALLATIONS
- F
REESTANDING
” section and then finish it
by performing the following (refer to Figure 16).
1. Install a tee with clean out on the outside of the
house.
2. Install PL vent upward from the tee. Make sure
that you install support brackets to keep the vent
straight and secure.
3. Install ceiling thimble and secure the flashing as
you go through the roof.
4. Ensure that the rain cap is approximately 24”
(600 mm) above the roof.
Installation
I
NSIDE
V
ERTICAL
I
NSTALLATIONS
:
Figure 16: Outside Vertical Installation.
O
UTSIDE
V
ERTICAL
I
NSTALLATIONS
:
Rain cap
Flashing
24"
(61 cm)
4"
(10 cm)
Tee with
cleanout
3" (7.5 cm)
Clearance
Support
bracket
Type "PL"
vent