beautypg.com

EV Rider Stand N Ride User Manual

Page 10

background image

Coupling the Tiller to the Base Frame:

- Remove the secondary safety knob from the tiller

coupler pin to allow the pin to slide through the
base frame receiver.

- Align the tiller coupler pin with the base receiver

tube and slide it over the tiller pin (Fig 11). Wiggle
it lightly until the locking spring locks in place. The
wire connector would have locked itself in place at
the same time.

- Make sure that the connection is secure by

deflecting the spring lock and verifying that it rests
on the groove of the tiller pin (Fig 12). This is an
indication that the connection is secured.

- Attach the secondary safety knob and tighten it (Fig

13).

Installing the Battery Pack:

- With the battery connector at the bottom of the of

the battery box facing forward (towards the front
wheel), slide the battery pack onto the battery
housing (Fig 14) until the top of the battery pack
lines itself up with the floorboard.

- Turn the ignition key to the ON position and tap the

horn button to verify the connection.

You are now ready to test your Stand N Ride!

Page 9

Fig 11

Fig 12

Fig 13

Fig 14