beautypg.com

Setup – Exmark OCD02 User Manual

Page 9

background image

Setup

9. Place the cable into the cable bracket notch and

secure with the two nuts. Make sure the nuts are
centered on the bracket.

10. Wrap the cable hanger strap over the cross shaft

and feed the loose end of the cable through the
strap holes as shown in Figure 5. Route the cable
around the back side of the cross shaft. Install the
other cable hanger strap on the right side of the
cross shaft. Set the cable aside.

Figure 5

1.

Foot pedal

4.

Cross shaft

2.

Cable bracket

5.

Cable hanger strap

3.

Cable

11. Install the gate linkage assembly onto the deck as

shown in Figure 6. Make sure the discharge baffle
bolt head is positioned to the outside of the deck.
Turn the bolt around if necessary.

Figure 6

1.

Discharge baffle bolt
head

3.

Gate linkage assembly

2.

Deck tab

12. Insert the chute pivot rod through the first tab

on the deck, gate linkage assembly, and discharge
deflector (see Figure 7). Install the link pivot
bracket onto the link pivot channel, located on
the gate linkage assembly. Route the chute pivot
rod through the link pivot bracket, the tabs on
the deck, gate linkage assembly, and discharge
deflector and install the hairpin. Orient the
hairpin as shown in Figure 7.

Figure 7

1.

Chute pivot rod

4.

Discharge deflector

2.

Deck tab

5.

Hairpin

3.

Link pivot bracket

13. Push down the front of the foot pedal and place

the link pivot bracket in the unlocked position
(Figure 8), attach the cable end onto the gate lift
link. Orient the hairpin as shown in Figure 8 and
install into the gate lift link.

9