BEFORE EVERY USE

Attention! The

cable

hoist is designed

only

for domestic use! It is not

intended for

professional applications.

This device

can

be operated

without

hazards

only

if

you

read this user manual

and safety

instructions

and

closely

follow

all

instructions.

Prior to

start-up operation

,

please be

sure to make some preparations:

 Make sure the

voltage of your

power network

complies with

the

voltage

listed

on

the

data

plate and

that the

device

is

equipped with

the

correct

power plug.

 Please make no-loading test before start-up operation at first, and please check:

a, The flexibility of the operating switch (16) to insure the controlling of the hoisting and

lowering of the load hook (12).

b, The flexibility of lift limit bracket (8) to make sure the cut-off of circuit.

c. The flexibility of down limit bracket (9) to make sure the cut-off circuit when the steel

cable (7) is nearly used up.

d, Any abnormal sounds when start-up operation.

e, The steel cable (7) is possible damaged

(split or bent)

, change the cable immediately.

 Please check the brake before operating after load.
 Please inspect the load hook (12) before operation is possible damaged or distortional,

replace it in time.

 Operation using

a

residual

current protective

device

(Emergency Switch, 15) offers

additional

protection.

 Please be

sure to the enough

lubricant

on parts. Daub the

lubricant

on the

load

hook (12)

,

cable

drum

shaft, slow down box, and bearing every half a year.

Please

daub the

lubricant

on

the nesting

of cable drum shaft when replace

the

steel cable

(7) every

time. Immediately replace the

cable if damaged.

 Please perform any rework and maintenance tasks only if the power plug is disconnected.
 Please inspect the device for transportation damages. Immediately report any possible

damages to your seller

.

8

INSTALLATION

 Install the cable hoist on a steel beam (Fig 2). Use only the enclosed installation brackets

(1) which can be attached to the top of the mounting casing (3) using the screws, washers
and spring lock washers. The steel beam must be able to withstand at least double the
rated weight of the machine. Contact a professional installer for best results.

 The steel beam must have the following dimension: 46 x 46 mm, a wall thickness of at

least 2.3 mm and a length of at least 450 mm (Fig 1).

 The steel beam must be securely anchored in a wall. The anchor must be installed

correspondingly sturdy in order to be able to withstand the load.

 Please be sure that the machine is installed level and not slanted.
 The remote control (14) must be easily accessible at all times and must therefore be

installed at a distance to the floor of between 0.8 m and 1.5 m (Fig 3).

 Insert the load hook (12) into the hook bracket (5) of the mounting casing (3) when using

the load hook with pulley (13).

 The electric pulley will be attached at the top. Attach the pulley with bearer frame on the

crossbar. The girder is then attached to the support columns. The support columns must
be, in accordance with the requirements of the customer, properly secured on the working
area. The support columns must be installed to be sturdy and stable. Also be able to
withstand a nominal load long-term.