Checking battery status, Changing tools, Torque pre-selection – Parkside PABS 18-Li B2 User Manual
Page 11: 2 gear drive
11
GB
Before first use
General safety advice for electrical power tools / Before first use
3. The green charging control LED
17
signals to
you that the charging process is complete and
the battery pack
6
is ready for service.
never charge the battery pack for a second time
immediately after a fast charging process has
been completed. This can give rise to the battery
pack becoming overcharged and to a reduced
service life of the battery and charging station.
Switch the charger off for at least 15 minutes
between two successive charging procedures.
Remove the power plug from the wall socket.
Q
Insertion / removal of a battery
pack into the appliance
Ensure that the appliance is switched off before in-
serting the battery. The insertion of a battery into an
electrical appliance that is switched on can lead to
accidents.
Inserting the rechargeable battery pack:
Move the rotation switch
2
into the middle
position (lock) and push the rechargeable bat-
tery pack
6
into the handle until it engages.
Removing the rechargeable battery pack:
Press the release button
7
and remove the
rechargeable battery pack
Q
Checking battery status
To check the battery status, press the battery
LED button
11
(refer to main diagram). The
status or residual capacity will be indicated in
the battery LED
10
as follows:
GREEn / RED / ORAnGE = maximum charge /
capacity
RED / ORAnGE = medium charge / capacity
RED = weak charge – recharge battery
Q
Changing tools
Your cordless electric drill / screwdriver has a fully
automatic spindle lock
and is fitted with an
enclosed keyless chuck incorporating the latest
technology from
”Made in Germany”.
Once the motor has come to a halt, the drive shaft
is automatically locked, so that the chuck
13
can
be opened simply by turning it
.
After you have inserted the required bit and fixed it
in place by turning the chuck
, you can immedi-
ately continue working. The spindle lock releases
itself automatically when the motor is started (by
operation of the On / Off switch
3
).
Q
Torque pre-selection
You can adjust the torque by using
14
torque pre-
selection. The torque levels regulate a range of up
to ca. 35 nm.
Select a low setting for small screws, soft work
material.
Select a high setting for large screws, hard
work materials and for the extraction of screws.
for drilling, push the selector to the setting for
drilling, in that you adjust the torque pre-selector
to the position .
for drilling tasks, also push the gear selector
switch
1
to the front (Position: 2).
Q
2 Gear Drive
CAUTION! Move the gear selector switch
1
only after the device has come to a standstill.
failure to observe this advice may result in damage
to the device.
In the first gear (Gear selector switch
1
in Position: 1)
A speed of up to approx. 400 rpm can be achieved
and a high torque. This setting is intended for use with
all screwing tasks and for accessories (see example
fig. B).
In the second gear (Gear selector switch
1
in Position: 2)
It achieves a speed of up to approx. 1400 rpm, for
the carrying out of drilling tasks (see example fig. A).