Product overview operation, Pre-start operating instructions, Product overview – Exmark ULTRA VAC LAZER Z HP User Manual
Page 10: Pre-start, Warning, Operating instructions, Operation
Operation
Product Overview
Figure 4
1.
Bag
4.
Blower
2.
Hood
5.
Tube
3.
Weight
Operation
Note: Determine the left and right sides of the
machine from the normal operating position.
Pre-Start
Make sure you understand the controls, their
locations, their functions, and their safety
requirements.
Ensure the blower, belt cover, bags, tube and hood
are in good condition, properly attached, and latched.
For units above Serial Nos. 600,000 with Triton
decks: Make sure that the adjustable dog leg baffle is
closed to match the intake into the Ultra Vac Blower.
WARNING
If the blower intake opening is not correct it
will allow objects to be thrown in operator’s
or bystander’s direction. Also, contact with
blade could occur. Thrown objects or blade
contact can cause serious injury or kill you
or bystanders.
Adjust dog leg baffle to match intake
opening.
Refer to the Maintenance section and perform all the
necessary inspection and maintenance steps.
Operating Instructions
Mowing
1. The Ultra Vac blower operates when deck drive
is engaged. Be sure that all persons are clear
of the mower deck before engaging the cutting
blades. Set the throttle to “midway” position. Pull
outward on the PTO switch to the “ROTATE”
position. Accelerate to full throttle to begin
mowing.
2. To disengage the deck drive and blower, set the
throttle to “midway” position. Push in on the
PTO switch to the “STOP” position to stop the
cutting blades and blower. The cutting blades will
require a slightly longer amount of time to come
to a complete stop when the blower is installed
on the deck.
10