Chapter 4, Chapter 4: hardware setup, Hardware setup – Lanner LEC-7388S User Manual
Page 17: Preparing the hardware installation
![background image](https://www.manualsdir.com/files/820405/content/doc017.png)
17
Hardware Setup
Chapter 4
Embedded and Industrial Computing
Chapter 4:
Hardware Setup
Preparing the Hardware Installation
To access some components and perform certain service
procedures, you must perform the following procedures
first.
WARNING: To reduce the risk of personal injury,
electric shock, or damage to the equipment,
remove the power cord to remove power from
the server. Portions of the power supply and some
internal circuitry remain active until power is
removed.
Unpower the LEC-7388S and make sure that the power
1.
source is removed.
Disconnect the two screws on the front panel from the
2.
system chassis. Pull the OPS module out for component
removal or installation.
Installing the System Memory
The motherboard supports DDR3L memory that features
data transfer rates of 1333 MHz to meet the higher
bandwidth requirements of the latest operating system
and Internet applications. It comes with one Double Data
Rate 3 Low Voltage (DDR3L) Small Outline Dual Inline
Memory Module (SO-DIMM) socket.
Put the device upside down.
1.
Take off the cover to access the memory.
2.
Align the memory module’s key with the SO-DIMM
3.
socket’s key.
Install the SO-DIMM.
4.
Install the cover back to the system.
5.
Note:
SO-DIMMs installed should meet the required
1.
speed which is DDR3L 1333 MHz. Do not install
SO-DIMM supporting different speeds.
The motherboards can support up to 16 GB
2.
memory capacity in maximum.