beautypg.com

Freestanding direct vent kit with coupler, Initial installation – Enviro Westport C-10794 User Manual

Page 22

background image

Figure 28: Cathedral Ceiling Support Box Leveling.

Figure 29: Cathedral Ceiling Support Box

Installation.

STEP 6. Complete the cathedral ceiling installation

by following the same procedures outlined

in Steps 4 through 9 for I

NITIAL

I

NSTALLATION

- V

ERTICAL

I

NSTALLATION

.

F

REESTANDING

D

IRECT

V

ENT

K

IT

W

ITH

C

OUPLER

:

KIT COMPONENTS:

Quantity

Description

Quantity

Description

1

Horizontal direct vent termination cap

1

Ø65⁄8” (17 cm) 90° elbow

2

Flue collar adapters (only one used)

4

Wire spacers

4

T-20 Torx screws

3

Decorative rings

1

Wall thimble

1

4 oz tube RTV silicone

1

Inside finish trim collar

20

9/16” tech screws

8

11⁄2” wood screws

1

Vinyl siding deflector

1

5’ (190 cm) length of Ø4” (10 cm)

double walled flex pipe

2

24” (61 cm) section of Ø65⁄8”

(17 cm) straight pipe

Please ensure that all components are supplied with this kit. If components are missing or have

been damaged, contact your dealer, distributor, or courier company. Do not attempt the installation if

components are missing or damaged.

INSTALLATION INSTRUCTIONS:
1. Decide on a location for the unit that will meet any or all local code requirements. Refer “Planning

Your Installation” and “Clearances to Combustibles”.

2. Set the appliance in the desired location. Determine if any wall studs, electrical wiring, or plumbing

pipes are in the way of the venting system as it passes through the wall. If obstructions are found in

the wall it may be necessary to adjust the location of the appliance.

22

Initial Installation

QUALIFIED INSTALLERS ONLY