Unpacking, Installation – Amer Networks SD16 User Manual
Page 9
5
U
NPACKING AND
I
NSTALLATION
This chapter provides unpacking and setup information for the Switch.
Unpacking
Open the shipping carton and carefully unpack its contents. The carton should contain the follo
wing items:
The 16-port 10/100Mbps Fast Ethernet Switch
One external power adapter
Four rubber feet to be used for shock cushioning
This User’s Guide
If any item is found missing or damaged, please contact your supplier for replacement.
Installation
The site where you install the Switch may greatly affect its performance. When installing, consid
er the following pointers:
Install the Switch in a fairly cool and dry place. See Technical
Specification for the acceptable operating temperature and humidity
ranges.
Install the Switch in a site free from strong electromagnetic source,
vibration, dust, and direct sunlight.
Leave at least 10cm of space at the left and right hand side of the
Switch for ventilation.
Visually inspect the DC power jack and make sure that it is fully
secured to the power adapter.