beautypg.com

13 sip, 14 high pressure operation, 15 tubing – Watson-Marlow 825 User Manual

Page 9: 16 materials of construction

background image

Watson-Marlow 825 and 840 User Manual

9

13 SIP

Observe a 1m safety area to avoid possible scalding if a tube burst occurs. Monitor
the process continuously .

If a tube burst occurs shut down the process, do not touch the pumphead until a 10
minute cooling period has been observed. Ensure a 15 minute acclimatisation peri-
od is observed before running the pump following SIP.

Maximum permissible SIP process temperature is 135 C.

14 High pressure operation

Ensure rocker mechanisms are locked to avoid premature wear.
Observe a 1m safety area to avoid contact with high pressure jets in the case of

a tube burst.

Please note that only tubing elements and not continuous lengths of tubing can be

used for higher pressure operation.
No quick connectors are to be used with element tubing during high pressure
operation.

15 Tubing

No length of tubing which has previously been used as a pumping element should
be used in the transfer section due to the fact that it may be in a weakened condi-
tion.

16 Materials of construction

Description

Material

Finish

Pumphead body

Aluminium

Epoxy polyester powder coated white finish

Pumphead door

Aluminium

Epoxy polyester powder coated white finish

Pumphead rotor

Aluminium

Epoxy polyester powder coated

Rollers

Stainless steel 316

Frame

Stainless steel 304

Connectors

Stainless steel 316

Door fixings

High tensile steel

Motor fixings

High tensile steel

Frame fixings

Stainless steel

Rocker locking
knob, 840

Polypropylene

Rocker locking
knob, 825

Stainless steel

Ensure that the pumphead door is closed and tool-
locked before SIP cleaning

This manual is related to the following products: