beautypg.com

TS Performance Dual CP3 User Manual

Page 2

background image

Installation of the TS Performance Power Play Dual

CP3 Controller

Read all instructions and fully understand them before installing you TS Performance MP-8 module.

Disconnect the battery terminals and remove keys from ignition before installation.

Place Di-Electric Grease onto every electrical connection.

1. Remove battery terminals from both batteries. We will first connect the two CP3 fuel

pumps together in conjunction with the ECU.


2. Disconnect the two pin bosch connector from the stock CP3 fuel pump

3. Plug our two pin bosch connectors in line with the factory connector allowing our module

to monitor the ECU control signal.

4. Route the other two pin bosch connector to the new CP3 pump.

5. Locate the Fuel Pressure Sensor on the fuel rail. It should be a three pin bosch connector

identical to the one on our harness. Disconnect the Fuel Pressure sensor and plug our
connector’s inline.

6. To power the module connect the black wire to good clean ground and the red wire to

Key-on +12V.

7. Route the rheostat through the firewall and mount in easy access location. Connect the

rheostat to the Dual CP3 module for on-the-fly control.

8. Re-connect battery terminals and your new Dual CP3 controller will be ready to go.