beautypg.com

Sprayer operation, Operation – Smithco Spray Star 3004 Operator Manual User Manual

Page 16

background image

14

Operation

SPRAYER OPERATION

SPRAY OPERATION

(After Proper Setup and Calibration)

1. Add

1

/

2

the amount of water required for the spray operation to tank using air gap filler.

2. Start engine, set engine speed below 2000 RPM, and engage pump after taking all previously described

safety and operation precautions.

3. Open agitator valve.

4. Add chemicals (taking all precautions described in this manual and by the chemical manufacturer).

a. Liquids may be poured directly into tank.
b. Wettable powder chemicals must be pre-mixed with water in a container to form a slurry. The mixture is

then added to the tank through the fillwell strainer.

c. Chemical in soluble packs are place into the fillwell strainer basket and dissolved by adding water through

the basket.

The balance of the water required for the spray operation is added to the tank through the fillwell strainer, using
the air gap filler. This will wash any undissolved chemical into the tank.

5. Transport to sprayer site with and agitator operating.

6. Set Engine speed between 2000-3200 RPM.

7. (Optional) Engage ground speed control.

8. Obtain desired spraying speed before activating spray with switches on spray control console.

Review the capacity of nozzles being used. Total capacity of all nozzles plus agitation system
must not exceed pumping system capabilities refer to Spraying Procedure
section of this manual.
FLUSH PUMP AFTER USE

Shut-Off 20GPM 40GPM 60GPM 80GPM 100GPM

120psi

100psi

80psi

60psi

30psi

10psi

100psi

95psi

76psi

52psi

26psi

5psi

80psi

75psi

62psi

45psi

21psi

-

60psi

55psi

40psi

25psi

5psi

-

To determine the correct performance data for your application, first shut off all flow on discharge side of pump and
detemine the shut-off pressure at the pump. Use this Shut-Off pressure to determine which line of data applies.