beautypg.com

Code xbj, Pre-installation, auxiliary heat exchanger – Dodge Sprinter 3500 User Manual

Page 167

background image

CODE XBJ

165

HEATING/COOLING

PRE-INSTALLATION,

AUXILIARY HEAT EXCHANGER

Pre-installation
for auxiliary heat
exchanger

Details and Technology

Two water lines (supply line/return line) are routed under the floor panel on the left hand side of the
vehicle, extending aft of the B-pillar. The ends of the two lines are connected by a hose. Bodywork
modifications for installation of a heat exchanger, the aperture in the wood floor for the warm air ducting
and electrical parts are not included.

Benefits and Arguments

• Simplified fitting of auxiliary heat exchangers from the accessories range
The pre-installation package is recommended for body manufacturers who offer their own hot water
heating systems.

Remarks

Pre-installation auxiliary heat exchanger is not available with Left Side Sliding Door (GKE) or C-pillar
cargo partition (GEX). Requires either the Front Auxilliary Heater (HDB) or Heater Booster (3JV).

This manual is related to the following products: