beautypg.com

Installation instructions, Hook-up guide (cont’d), Outlet box installation (cont’d) – Monster FlatScreen SuperThin In-Wall PowerCenter 200 User Manual

Page 18

background image

ENGLISH

Outlet Box Installation (cont’d)

B) Pull the main line (Black), neutral

(White), and ground (Green) wires

out from behind the wall. Using

a hammer and slotted screwdriver,

punch out the Two-Gang Outlet Box’s

entry holes as necessary for wire

routing. Thread the wires through,

allowing 3–5 inches for slack.

INSTALLATION INSTRUCTIONS

Hook-Up Guide (cont’d)