Sizes of the mains cables and fuse ratings for the machine at 100 % duty cycle are specified in
the table below:
Rated voltage
Fuses, slow-blow
Connection cable *) mm²
400 V 3~
35 A
H07RN-F 4G10 (10 mm²)
230 V 3~
50 A
H07RN-F 4G10 (10 mm²)
*) In cables of S type there is a protective grounding conductor coloured green-yellow.
2.4 Welding and earth cables
Recommended copper cables with cross-sectional area are as follows:
FastMig KMS 400 MVU
70 ... 90 mm²
In enclosed table are shown typical load capacities of rubber insulated copper cables, when
ambient temperature is 25º C and lead temperature is 85º C.
Cable
Duty cycle ED
Voltage loss / 10 m
100 %
60 %
30 %
50 mm²
285 A
370 A
520 A
0,35 V / 100 A
70 mm²
355 A
460 A
650 A
0,25 V / 100 A
95 mm²
430 A
560 A
790 A
0,18 V / 100 A
Do not overload welding cables due to voltage losses and heating.
Fasten the earth clamp of the return current cable carefully, preferably direct onto the piece to
be welded. The contact surface of the earth clamp should always be as large as possible.
Clean the fastening surface from paint and rust.
3.
OperatiOn COntrOl sWitChes anD pOtentiOmeters
3.1 main switch i/O
When you turn the switch into I-position, pilot lamp H11 on the front face is illuminated and
the machine is ready for use.
NOTE!
Always turn the machine on and off with the mains switch, never use the mains plugs as a
switch.
3.2 pilot lamps
The pilot lamps of the machine report the electric operation:
The green pilot lamp H11 when lit indicates that the machine is on and ready for use and it is
connected to the mains supply with the main switch in the I-position.
H12 indicates when lit that the thermal protection of the machine has been activated due to
over heating. The cooling fan will continue to run and cool the machine down and when the
lamp is off the machine is ready to weld.
3.3 Operation of cooling fan
In FastMig power sources there are two simultaneously operating fans.
• The fan is started for a moment when main switch is placed into position I.
• The fan will start during welding as the machine heats up and it will run for 1 to 10
minutes after the welding has stopped.