7 installation, 8 electrical interface, 9 setup – Fluke Biomedical 6000-529 User Manual
Page 8

Victoreen 6000-529
Operators Manual
1-4
1.7 Installation
Ensure all power is removed prior to installing the
Model 6000-529 Ion Chamber.
Installation of the Model 6000-529 consists of connecting the ion chamber to a Model 4000M+, 4000+,
6000B, 6000M, RAD-CHECK® Plus, or any medical grade electrometer.
The Model 6000-529 may also be used with the Model 6000-531 preamplifier for interfacing with the 4000
or 6000 series of instruments. Refer to the 6000-531 manual for interface details.
A handle is also included with the ion chamber for supporting the ion chamber for in-air measurements.
1.8 Electrical Interface
Final electrical interface connections between the preamplifier, the Ion Chamber, and the host instrument
are listed in Table 2-1.
Table 2-1.
Electrical Interface Connections
Connector Description
BNC Ion
Chamber
Output
HV (BIAS)
Ion Chamber High Voltage
1.9 Setup
Because the Model 6000-529 Ion Chamber may be used with many commercially available electrometers
and dosimeters, please refer to the applicable instrument manual for set up and calibration.
CAUTION