Installation – Flowserve UBK 46 User Manual
Page 13
![background image](https://www.manualsdir.com/files/785078/content/doc013.png)
13
1. Observe position of installation.
2. Observe flow direction. The flow direction arrow is located on the trap body.
3. Leave at least 70 mm free space around the equipment for subsequent disassembly of the cover C
C
C
C
C.
4. Remove plastic plugs. They are only used for transit protection.
5. Remove regulator as described under “Maintenance”.
6. Clean socket-weld ends.
7. Arc-weld trap only manually (welding process 111 and 141 complying to ISO 4063 or equivalent
standard).
1. Observe position of installation.
2. Observe flow direction. The flow direction arrow is located on the trap body.
3. Leave at least 70 mm free space around the equipment for subsequent disassembly of the cover C.
4. Remove plastic plugs. They are only used for transit protection.
5. Clean internal threads.
6. Install steam trap.
1. Observe position of installation.
2. Observe flow direction. The flow direction arrow is located on the trap body.
3. Leave at least 70 mm free space around the equipment for subsequent disassembly of the cover C.
4. Remove plastic plugs. They are only used for transit protection.
5. Clean gasket surfaces of the two flanges.
6. Install steam trap.
Installation
UBK 46
The UBK 46 can be installed in any position. When installed horizontally the cover must be on top.
Design with flanged ends
Design with screwed sockets
Design with socket-weld ends
Design with butt-weld ends
1. Observe position of installation.
2. Observe flow direction. The flow direction arrow is located on the trap body.
3. Leave at least 70 mm free space around the equipment for subsequent disassembly of the cover C
C
C
C
C.
4. Remove plastic plugs. They are only used for transit protection.
5. Clean butt-weld ends.
6. Arc-weld trap manually (welding process 111 and 141 complying to ISO 4063 or equivalent
standard) or use gas-welding process 3 in accordance with ISO 4063.