Installation – Flowserve AK 45 User Manual
Page 10

0
Installation
AK 45
Install the AK so that discharge is to open drain (without back pressure), preferably in a vertical line
with downwards flow.
The AK 45 can be installed in any plane with flow in the direction of the arrow. When the valve is
installed in a horizontal line, the cover must be on top.
If it is necessary to install the AK 45 in a horizontal line, the pipe on the discharge of the trap should
include a 90° downwards bend,
Fig. 3, Fig. 4.
Flanged design
. Observe position of installation.
. Observe flow direction. The flow direction arrow is located on the valve body.
. Leave at least
40 mm free space around the equipment for subsequent disassembly of the
cover
E.
4. Remove plastic plugs. They are
only used for transit protection.
5. Clean gasket surfaces of the two flanges.
6. Install condensate drain valve.
Screwed design
. Observe position of installation.
. Observe flow direction. The flow direction arrow is located on the valve body.
. Leave at least
40 mm free space around the equipment for subsequent disassembly of the
cover
E.
4. Remove plastic plugs. They are
only used for transit protection.
5. Clean internal threads.
6. Install condensate drain valve.