Assembly instructions - akh2a/da, Technical manual, Assembly instructions akh2a/da – Flowserve AKH2A Atomac Lined Ball Valve IOM User Manual
Page 17

AKH2A -
atomac ball valve
Ahaus GmbH
von-Braun-Straße 19a
D-48683 Ahaus
Postfach 1162 D-48661 Ahaus
Telefon: +49(0) 2561-686-100
Fax: +49(0) 2561-686-200
Register:
13
Page:
18
Date:
12.1995
Revision:
08.2009
Technical Manual
Assembly Instructions AKH2A/DA
The general installation and maintenance instructions must be observed.
Attention, please take care of the right direction of the indicator while assembly.
1. Screw stud bolts
(120) into body (010).
2. Insert stem
(040) from inside of body in such a way that the flat side is paral-
lel to body longitudinal axis.
3. Insert chevron packing
(100).
4. Install gland insert
(065), gland follower (060), safety washers (150),
hexagon nuts
(110) and grounding strap (170) also on valves with actuator.
5. Install hand lever
(070) on to stem (040) and tighten it using lock washer
(130) and hexagon bolt (140).
6. Insert first ball seat ring
(030) into body (010).
7. Insert ball
(050) to valve stem by pushing the ball in a downward motion
through valve body.
8. Turn hand lever 90° of longitudinal axis of body.
9. Install ball seat ring with pressure compen-
sation grooves
(035) on to ball (050).
10. Install side piece
(020) on to body (010).
11. Install body bolts
(080) and hexagon nuts
(090) and tighten by crisscross
method to recommended torques.
12. Assemble stop
(210) with
hexagon bolt
(220).