1. Description and connection

The heating cables should be connected to a 230V, 50Hz electricity network. Degree of protection:

IP67.

The cable jacket is resistant to UV radiation, jacket temperature resistance is 70°C, and it is self-

extinguishing.

The protective braiding is to be connected to the PE protective conductor.

2. Use in thawing gutters, downspouts and roofs where snow does

not melt on its own


Cables installed in guttering systems provide protection against damage caused by freezing water. The

heating cables melt the ice so that water may flow out freely.

Cables installed on a roof provide protection in the following cases:


a) when snow cannot slide down on its own from the roof into the gutters and it accumulates at

the snow-breaking barriers or valleys, causing the roof covering to be overloaded excessively
due to the accumulated wet snow,

b) when snow cannot slide down on its own from the roof into the gutters and so the accumulated

water below the snow barrier creeps in through the roof covering and leaks into the building,
and

c) when snow sliding down from the roof forms into a cornice and does not flow into the gutters.

These systems are always combined with laying the cable into the gutters and downspouts (for
example, by laying the cables in a saw-toothed pattern).
If installed on a roof, the heating cable must be prevented from being damaged (torn away) by sliding
snow.


a) Dimensioning

For regular gutters and downspouts (Ø 150 mm), the unit is installed for a heat output of 30–40
watts/meter. For altitudes of 1,000 m and more above sea level, the heating output should be based on
local conditions but be at least 60 W/m. The spacing between the cables in the gutters and downspouts
should not be more than 80 mm. The surface-area output of the cables in the gutters and on the roofs
should be 250 W/m

2

to 300 W/m

2

, and not less than 300 W/m

2

for altitudes of more than 1,000 m above

sea level.


b) Installation

To attach the heating cable into a standard gutter or downspout (Ø 150 mm), use a “gutter clip” or a
“downspout clip” (clips to the downspouts are to be fixed by a chain). The distance between the clips
should not be more than 25 cm.

To attach the heating cable in atypical gutters, valleys, and on roofs, use a “C” roof clip or a special

clipping method according to local conditions. The heating cable is fixed using four clips per meter of
cable length.