Venting installation instructions – Desa (V)VC42PE Series User Manual
Page 13

www.desatech.com
116237-01F
13
CORNER INSTALLATION
Recommended Applications:
• Corner ground floor installation
• Ground floor installation where pipe vents horizon-
tally through wall (over 12" horizontal pipe)
• Basement installation where one foot clearance
from ground to termination is possible
VENTING INSTALLATION INSTRUCTIONS
Continued
Figure 15 - Horizontal Termination Configuration for Corner Installation Using One
90° Elbow
Square 
Termination 
Wall 
Firestop
Not to Exceed (H) Limits
As Required 
for (V), See 
Chart for 
Pipe Section 
Required
45° Elbow
90° Elbow
90° Elbow
Square 
Termination
Wall 
Firestop
45° Elbow
12" Min.
Required
Vertical (V)
Vertical Pipe Horizontal (H)
*43
1
/
2
" min.
None
30" max.
54
1
/
2
" min.
1 ft.
48" max.
66
1
/
2
" min.
2 ft.
60" max.
78
1
/
2
" min.
3 ft.
84" max.
90
1
/
2
" min.
4 ft.
20' max.
* Ground Floor Corner Venting
Not to Exceed 
(H) Limits
SNORKEL TERMINATION INSTALLATION
Recommended Applications:
• Installations requiring a vertical rise on building exterior
• Any installation using snorkel termination to achieve one foot above ground
Snorkel terminations are available for installations requiring a vertical rise on the exterior of the building.
If installing snorkel termination below grade, you must provide proper drainage to prevent water from
entering snorkel termination (see Figure 16). Do not back fill around snorkel termination.
Snorkel Termination
12" 
Min.
Snorkel 
Termination
Wall 
Firestop
90° Elbow
45° Elbow
Figure 16 - Snorkel Termination Configurations for Below Ground Installation
Snorkel Termination
Adequate 
Drainage
12" Min.
12" Min.
