Drolet 58991 User Manual
Page 12
11
CLEARANCES FROM COMBUSTIBLES
It is of outmost importance that the clearances to combustible materials be scrupulously
respected upon installation of the stove you have selected. Refer to the tables below :
Single pipe / Double pipe
Model A
B
C
D
E
F
Eldorado 15/6
18/18
12/12
21.5/12.5 30.5/30.5 24/24
Adirondack 15/5
12/12
10/8
21.5/11.5 24.5/24.5 22/20
Savannah 15/6
18/18
12/12
21.5/12.5 30.5/30.5 24/24
Celtic 15/5
12/12
10/8
21.5/11.5 24.5/24.5 22/20
Jurassien 14/7
8/8
10/6
20.8/13.7 23.5/23.5
22.2/18.2
• Floor to ceiling height must be at least 7' (84") in all cases.
• The clearance between the flue pipe and a wall are valid only for vertical walls and for
vertical flue pipe.
• The flue pipe must not go through roof trussing, an attic, a wardrobe, a floor, a
combustible partition, or similar spaces.
• A flue pipe crossing a combustible wall must have a minimum clearance of 18".
• To reduce flue pipe clearances from combustible materials, contact your local safety
department.